Uzbekistan is the largest mining producer in Central Asia, producing 120 tonnes of gold in 2025 (ranked 6th globally) and 150,000 tonnes of copper. Under its "Uzbekistan-2030" strategy, the country targets copper output of 500,000 tonnes and gold output of 155 tonnes by 2030, with plans to attract $30 billion in investment into the mining and geology sectors.
Home to the world's second-largest gold mine — Muruntau in the heart of the Kyzylkum Desert — Uzbekistan's flagship producer, Navoi Mining and Metallurgical Combinat (NMMC), is undergoing major expansion. Meanwhile, Almalyk Mining and Metallurgical Complex (AMMC) in Tashkent region is advancing a $2.7 billion copper concentrator expansion project. In February 2026, the US and Uzbekistan signed a critical minerals agreement, further accelerating the internationalization of the country's mining development.
As mines expand and new projects launch, existing worker accommodation in the Navoi region and Kyzylkum Desert mining areas is far from adequate. These mine sites lie deep in the desert — the nearest towns are 50 to 100 kilometers away, making daily commuting impractical.
A gold mining company operating in Uzbekistan's Navoi region contacted 9States to build a standardized 400-bed worker camp for its expanding gold mine project.
| Camp Capacity | 400 persons (expandable to 550) |
| Total Area | Approximately 5,500 m² |
| Construction Timeline | 4 months |
| Climate Conditions | Temperate continental desert — summer extreme heat up to 48°C, winter lows down to -20°C, annual rainfall below 150 mm, diurnal temperature variation exceeding 20°C, frequent spring sandstorms |
| Facilities Required | Dormitories (4-person with private bathroom), mess hall (150 seats), medical clinic, offices, laundry, recreation room, emergency generator station |
| Logistics | Shanghai → Khorgos Port (Xinjiang) → Kazakhstan (road/rail) → Uzbekistan; combined rail & road transport |
Using traditional brick-and-mortar construction presented several serious obstacles:
9States delivered a 400-bed flat-pack modular camp solution, specifically customized for Uzbekistan's extreme continental desert climate and inland logistics constraints.
The camp is divided into three functional zones: Accommodation Zone — 120 modular dormitories (96 four-person rooms + 24 two-person rooms for management), all with private bathrooms and heating/cooling air conditioning; Public Services Zone — 150-seat mess hall, medical clinic, laundry, recreation room, and an emergency diesel generator station; Administration Zone — 10 offices and 2 meeting rooms. All buildings are connected by covered walkways to minimize outdoor exposure during sandstorms.
Each module is factory-produced in 9States' Shanghai plant in flat-pack form, folding to approximately 30 cm thick panels that fit into standard 40-foot shipping containers. The logistics route follows the China-Europe Railway (China-Central Asia corridor): Shanghai → (truck transport to) Xi'an International Port Station → China-Central Asia Railway via Khorgos border crossing → Kazakhstan (Almaty) → Uzbekistan (Tashkent) — approximately 5,000 km by rail, transit time about 15 to 18 days.
From Tashkent, containers travel approximately 400 km west via the M37 highway to the Navoi mine site. Cargo is dispatched in batches of 6-8 containers per week, synchronized with on-site foundation work. On arrival, a 4-person team can assemble each flat-pack module in approximately 30 minutes using only hand tools — no welding or heavy lifting equipment required.
| Total Beds | 400 (expandable to 550) |
| Dormitory Units | 120 (96 four-person + 24 two-person, all with private bathroom and HVAC) |
| Mess Hall | 150 seats with dedicated kitchen |
| Medical Clinic | 1 (with isolation room) |
| Office Modules | 10 offices + 2 meeting rooms |
| Recreation | TV room, table tennis, outdoor activity area |
| Emergency Power | 1 × 200 kW diesel generator station (auto-transfer switch) |
| Total Area | ~5,500 m² |
| Total Modules | 180 (flat-pack type) |
| Wall Insulation | 75 mm polyurethane (PUR) sandwich panel |
| Design Life | 15 years (desert environment) |
| On-site Installation | ~5 weeks (12 workers + 2 supervisors) |
For more information about mining camp solutions in Central Asia, visit 9States at 9prefabhouse.com.
From Camp to Micro-City: The Circular Life of Modular Mining Communities
Doing the Math: The Total Cost of Ownership Behind Modular vs. Traditional Site Housing
The Camp Workers Want to Stay In: Light, Quiet and Privacy as Retention Tools
Keeping the Weather Outside: How Modular Camps Engineer Their Own Microclimate