Chile, the world's largest copper producer, is advancing 13 major copper projects in 2026, driving surging demand for mining workforce accommodation. In response to this market opportunity, 9States successfully delivered an 800-bed modular worker camp for a mining operator located in the high-altitude Andes region of northern Chile.
| Parameter | Specification |
| Camp Capacity | 800 beds (dormitories, dining hall, showers, offices) |
| Unit Type | 3m × 6m flat-pack prefab container (quick-assembly type) |
| Total Modules | 240 standard modules |
| Dormitory Configuration | 4 persons per room, with lockers, lighting, power outlets |
| Common Facilities | 2 dining modules, 4 shower/sanitary modules, 6 office/management modules |
| Project Timeline | 45 days production + 20 days on-site installation |
Located above 3,000 meters in the Atacama Desert, the mining site experiences extreme diurnal temperature swings (nighttime lows around 0°C to daytime highs exceeding 40°C), intense UV radiation, strong winds, and arid conditions with sand and dust. Our engineering team implemented a series of targeted modifications to ensure comfort and durability.
The modules were shipped in flat-pack configuration — each 40-foot standard container can hold 12 module kits, significantly reducing sea freight costs. Goods departed from Shanghai Port, crossed the Pacific to San Antonio Port, Chile, then traveled approximately 1,300 km by road to the mining site in the Andes.
On-site assembly used a fully bolted connection system — no welding required. Our engineering team provided on-site supervision, completing assembly of all 240 modules within 20 days.
"9States' project execution exceeded our expectations. From order to move-in took less than 3 months. The quality and comfort of the camp modules are excellent, particularly impressive considering the remote high-altitude location."
— Camp Project Manager, the mining company
With over 15 years of export experience to 100+ countries, 9States provides end-to-end solutions — from design and production to on-site installation. Whether you need a mining camp, construction site office, or any workforce accommodation, we deliver reliable quality at competitive prices.
Contact us today to discuss your workforce housing project.
From Camp to Micro-City: The Circular Life of Modular Mining Communities
Doing the Math: The Total Cost of Ownership Behind Modular vs. Traditional Site Housing
The Camp Workers Want to Stay In: Light, Quiet and Privacy as Retention Tools
Keeping the Weather Outside: How Modular Camps Engineer Their Own Microclimate