A copper-gold mine expansion project in Mongolia's South Gobi province required urgent workforce accommodation. The site is located approximately 550 km south of Ulaanbaatar, just 80 km from the China-Mongolia border. As the project transitioned into underground mining expansion, the construction workforce grew from 300 to 800 workers — far exceeding the capacity of existing facilities.
The region experiences extreme continental climate — winter temperatures dropping to -35°C, summer surface temperatures exceeding 40°C, annual precipitation below 100mm, and frequent sandstorms. Under these conditions, traditional reinforced concrete construction is impractical — curing alone would consume most of the project timeline.
| Parameter | Specification |
| Bed capacity | 800 persons |
| Total camp area | Approx. 12,000 m² |
| Construction deadline | 90 days maximum |
| Insulation standard | Interior 18°C+ while exterior at -35°C |
| Infrastructure | 120 km from nearest town, diesel-generated power, no municipal water supply |
| Wind resistance | Category 8 wind load |
The core challenge: short deadline + extreme cold + remote location = traditional construction methods completely unworkable.
The camp was designed with a modular layout divided into four functional zones:
Zone A – Accommodation (Core)
Zone B – Office & Command Center
Zone C – Living Facilities
Zone D – Logistics Support
| Parameter | Specification |
| Module dimensions | Standard 6m × 3m (18 m² per module) |
| Wall structure | 75mm rock wool sandwich panel + 50mm interior insulation liner |
| Roof insulation | 100mm polyurethane spray foam + waterproof membrane |
| Floor system | Elevated steel chassis + 50mm XPS insulation + PVC flooring |
| Windows | Double-glazed Low-E glass, thermally broken aluminum frames |
| Doors | Insulated security doors with rubber seals |
| Heating | Centralized diesel boiler + hot water radiator circulation |
| Seismic rating | Intensity 7 (China standard) |
| Design lifespan | 15 years |
Mongolia's winter is no joke — -35°C combined with unobstructed Category 8 winds across the Gobi Desert creates wind-chill equivalents below -45°C.
Our solution employs a three-layer insulation system:
Test results: With exterior temperatures at -35°C and heating running at 60% capacity, interior temperature maintained a stable 20°C.
The site is 550 km from Ulaanbaatar and approximately 280 km from the Ceke Border Crossing with China.
Optimal route:
China Tianjin Port → Ceke Border Crossing (approx. 1,200 km overland) → Customs clearance → Mine site (approx. 280 km by road)
Module transportation:
On-site assembly:
| Solution | Unit Cost (per bed) | Timeline | Adaptability |
| Traditional concrete | $3,500–4,500 | 6–8 months | Poor (winter construction halt) |
| Container conversion | $2,000–2,800 | 2–3 months | Fair (insufficient insulation) |
| Modular solution | $2,800–3,200 | 2.5–3 months | Excellent (extreme cold verified) |
The modular solution delivers approximately 30% cost savings over traditional concrete construction while reducing project timeline by over 60%. Although slightly more expensive than container conversions, it provides vastly superior insulation — a non-negotiable requirement in Mongolia's climate conditions.
"At our previous mine site, we used converted container accommodations. Workers couldn't sleep through the complaints about the cold. After switching to the modular solution, interior temperatures remained stable and worker satisfaction improved dramatically. The biggest advantage was completing everything in one phase — no curing wait times like concrete. We delivered the entire camp before winter set in."
— Camp operations lead, winter 2025 operational review
Mining camps in Mongolia face the triple challenge of extreme climate + compressed timelines + remote locations. Traditional construction methods become nearly impossible on the Gobi Desert at -35°C — concrete requires positive temperatures for curing, masonry work efficiency plummets in winter, and worker productivity drops sharply in severe cold.
The core advantage of modular construction is that 90% of work is completed in the factory:
For mining projects in extreme cold regions such as Mongolia, Kazakhstan, and Russia's Far East, modular construction isn't a "better option" — it's the only viable option.
9States provides end-to-end modular camp solutions from design to delivery, covering Central Asia, Southeast Asia, the Middle East, Africa, and South America.
From Camp to Micro-City: The Circular Life of Modular Mining Communities
Doing the Math: The Total Cost of Ownership Behind Modular vs. Traditional Site Housing
The Camp Workers Want to Stay In: Light, Quiet and Privacy as Retention Tools
Keeping the Weather Outside: How Modular Camps Engineer Their Own Microclimate