600-Bed Modular Worker Camp for Argentina's Salta Lithium Project - High-Altitude Camp Solution for the Puna Plateau

Views : 89
Author : 9States
Update time : 2026-07-14 12:59:33

Project Overview

Location Salta Province, Puna Plateau, Argentina
Mineral Type Lithium (Salt Lake Brine)
Contract Type Design + Manufacturing + Logistics + On-site Installation Guidance
Capacity 600 Persons
Total Floor Area Approx. 4,800 m²
Product Type Prefabricated Folding Container House
Delivery Timeline 60 days for production, 30 days for on-site installation

Camp Layout

The 600-person camp is designed with functional zones, including the following core areas:

Accommodation Zone

  • 300 twin-bed dormitory units (approx. 16 m² each, with private bathroom)
  • 10 two-story buildings, 20 rooms per floor
  • Connected corridors with open layout to minimize land use

Amenities Zone

  • Dining hall: seats 200 persons, equipped with professional kitchen
  • Shower rooms and laundry: centralized hot water system for shift workers
  • Recreation room: satellite TV, table tennis, fitness equipment
  • Wi-Fi coverage across the entire camp

Office & Administration Zone

  • Mine site office: meeting rooms, dispatch center, engineer workstations
  • Medical room: first aid and altitude sickness treatment
  • Security booth and access control system

Infrastructure

  • Complete water supply, drainage system, and septic tanks
  • Diesel generator set (backup power)
  • Fuel-fired hot water boiler (central heating and hot water)
  • External grid connection (mine-owned power station)

Custom Design for High-Altitude Environment

The Puna Plateau's conditions impose special requirements on building materials:

Insulation

  • Walls: 50mm rock wool composite panels; Roof: 75mm polyurethane composite panels
  • Double-layer Low-E hollow glass windows to minimize heat loss
  • Electric heaters in dormitories, maintaining indoor temperature above 18°C even in extreme winter cold

UV Protection

  • Exterior coating: weather-resistant PVDF fluorocarbon paint against intense high-altitude UV radiation
  • Light-colored roof coating to reflect solar radiation and reduce summer indoor temperature

Ventilation & Oxygen

  • At 3,700m altitude, oxygen content is only ~60% of sea level; mechanical ventilation in all dormitories
  • Oxygen concentrator interface reserved in common areas

Wind Resistance

  • Folding container houses bolted to concrete foundations, rated for wind loads up to 12
  • Sealed corridor design to prevent dust and cold air ingress

Logistics & Installation

  1. Units folded to transport state before sea freight, reducing volume by ~70%
  2. Sea freight from Shanghai Port to Antofagasta, Chile (~35 days)
  3. Overland transport across the Andes to Salta mining site (~700 km, 5 days)
  4. Local construction crew with 9States technical guidance for installation
  5. Each dormitory unit can be unfolded and fixed within 2 hours
  6. Full camp ready for occupancy within 30 days of arrival

Client Feedback

"The plateau climate was a huge challenge for us and our workers. 9States' folding container solution solved our accommodation needs in record time. The wall insulation was impressive — even on sub-zero winter nights, the rooms were far more comfortable than we expected."
— On-site Construction Manager, Salta Lithium Project

Conclusion

As the global EV industry drives surging lithium demand, Argentina's Puna Plateau is emerging as a hotspot for lithium mining development. High altitude, extreme temperature swings, and remote locations present significant accommodation challenges — and modular construction offers a solution built on speed and reliability.

9States is committed to delivering high-quality modular camps for mining clients worldwide, ensuring every mine has dignified worker accommodation.

Related News
Read More >>
From Camp to Micro-City: The Circular Life of Modular Mining Communities From Camp to Micro-City: The Circular Life of Modular Mining Communities
Aug .25.2026
Why modular camps are circular assets that relocate, reuse and upgrade across projects - and how they evolve from worker housing into sustainable micro-cities.
Doing the Math: The Total Cost of Ownership Behind Modular vs. Traditional Site Housing Doing the Math: The Total Cost of Ownership Behind Modular vs. Traditional Site Housing
Aug .25.2026
Why the real cost of worker camps lies in lifecycle not unit price - transport, install, operations, durability and relocation of modular vs traditional site housing.
The Camp Workers Want to Stay In: Light, Quiet and Privacy as Retention Tools The Camp Workers Want to Stay In: Light, Quiet and Privacy as Retention Tools
Aug .25.2026
How lighting, sound insulation and privacy in modular worker camps become retention tools - and why livable design drives lower turnover and safer operations.
Keeping the Weather Outside: How Modular Camps Engineer Their Own Microclimate Keeping the Weather Outside: How Modular Camps Engineer Their Own Microclimate
Aug .25.2026
How modular worker camps build a self-sustaining microclimate - insulation, ventilation and off-grid energy that keep extreme weather outside and comfort inside.